ESSO Chevron et al Isserk I-15 Drilling Program

General Comments

Comments posted before structured commenting periods were introduced.

S
System Admin EIRB Staff 13 days ago

The EISC screening will consider whether the range of water depths warrants differentiated assessment. This will be addressed in the upcoming screening meeting.

J
Jamie Doiron 13 days ago

The project description mentions drilling in water depths of 60 to 1500 metres. The environmental risks at those depths are very different. The review should assess impacts separately for shallow and deep water scenarios.

C
Carol Public 13 days ago

I'd like to know what contingency plans are in place for ice scour events at the Isserk I-15 location. The Beaufort Sea shelf is known for significant ice movement in that area.